Nota: Los IDs de listado de Alluvit Media son propietarios y solo para referencia interna. No corresponden a identificadores del proveedor ni indican propiedad. Las imágenes y creativos de muestra son solo ilustrativos.
| Tipo | Ubicación | Ciudad / Estado | Millas |
|---|---|---|---|
| Premiere Panel | 36th St SS 450ft W/O Mission F/E - 1 ↗︎ | Tucson, AZ | 4.95 |
| Premiere Panel | Stone ES 40ft S/O Jacinto F/S - 2 ↗︎ | Tucson, AZ | 0.61 |
| Premiere Panel | Stone WS 200ft N/O Blacklidge F/S - 1 ↗︎ | Tucson, AZ | 0.33 |
| Premiere Panel | Oracle Rd WS 10ft N/O Drachman F/S - 1 ↗︎ | Tucson, AZ | 1.48 |
| Premiere Panel | Grant SS 0.58mi E/O Silverbell F/E - 1 ↗︎ | Tucson, AZ | 1.66 |
| Premiere Panel | Park WS 95ft N/O Silverlake F/N - 2 ↗︎ | Tucson, AZ | 4.40 |
| Premiere Panel | Prince NS 150ft W/O Flowing Wells F/W - 1 ↗︎ | Tucson, AZ | 1.31 |
| Premiere Panel | Stone ES 125ft N/O Rillito F/N - 1 ↗︎ | Tucson, AZ | 0.93 |
| Premiere Panel | Miracle Mile SS 250ft W/O Fairview mm 69.0 F/E - 1 ↗︎ | Tucson, AZ | 0.58 |
| Premiere Panel | Oracle WS 125ft N/O Alturas mm 69.66 F/S - 1 ↗︎ | Tucson, AZ | 0.59 |
Diseño Creativo GRATIS: Equipo de diseño creativo interno disponible a pedido sin costo adicional. También tenemos hojas de especificaciones y plantillas disponibles para todas las vallas.
Producción: Un costo de producción único aplica a todas las vallas estáticas a menos que se indique lo contrario. El tiempo de producción es de aproximadamente dos semanas desde la aprobación de la prueba de diseño final.
Prueba de Desempeño: Una vez que su campaña esté activa, le enviaremos una foto profesional de su valla para compartir en redes sociales, el sitio web de su empresa, etc.
Impresiones Verificadas Por