Bulletin Ad (14' x 48') @ San Jose Creek & San Gabriel River Confluence (City of Industry)

Alluvit Listing ID 5235
Map of San Jose Creek & San Gabriel River Confluence (City of Industry) Location photo for San Jose Creek & San Gabriel River Confluence (City of Industry)
Tip: Street View isn't always exact — try rotating or moving a little to center the board clearly.
Map unavailable. Image unavailable. Street View unavailable at this spot.
Alluvit Listing ID 5235
This San Gabriel Valley bulletin is located on heavily traveled San Gabriel (605) Frwy. Positioned just north of the Pomona (60) Frwy in the City of Industry. Area is heavily Hispanic. Display reaches commuters traveling to Irwindale Speedway, Fairplex Pomona, Raging Waters, Foothill Communities and Pasadena.
Check Availability
City / StateSouth El Monte CA
CountyLos Angeles County
ZIP91733
Board Specs
Media TypeBulletin
Panel Size14' x 48'
IlluminatedYes
FacingSouth
ReadLeft
Weekly Impressions751,487
Local Demographics
Population3,350
Households1,022
Median HH Income$79,412
Median Age40.8
Population (by %)
White17.7%
Black3.9%
Asian8.2%
Am. Indian / Alaska Native0.7%
NH / Pacific Islander0.0%
Other54.9%
Two or More Races14.7%

Hispanic (any race)79.4%
Based on 2023 US Census (ACS 5-year).
Figures represent the Census block-group that contains this location.
Points of Interest
San Jose Creek & San Gabriel River Confluence (~0.28 mi)
Parkway Drive & Fineview Street (~0.39 mi)
Workman Mill Rd and Crossroads Pkwy No (~0.42 mi)
Crossroads Pkwy N and Workman Mill Rd S (~0.45 mi)

Note: Alluvit Media listing IDs are proprietary and for internal reference only. They do not correspond to vendor-owned identifiers and do not indicate property ownership. Images and mock creatives are illustrative only.


More Like This

A to Z Service

FREE Creative: In-house creative design team available upon request at no additional cost. We also have spec sheets and templates available for all boards.

Production: A one-time production cost applies to all static boards unless otherwise noted. Production time is approximately two weeks from approval of final design proof.

Proof of Performance: Once your campaign goes live, we will send you a glam photo of your board for sharing on social media, your company website, etc.